Second Local Lane and Two Ramps Open Today on Dan Ryan Expressway

share/save  Save to del.icio.us  Submit to digg  Submit to Fark  Seed this on Newsvine  Submit to reddit  Save to Yahoo My Web
 

CHICAGO, July 8 /PRNewswire/ -- The Illinois Department of Transportation (IDOT) is pleased to announce the opening today of a second local lane and two entrance and exit ramps on the southbound Dan Ryan Expressway (I-90/94). Heavy rain brought on by harsh thunderstorms in the early morning hours last week prevented work crews from opening the lane and ramps before the Fourth of July weekend. Later this month on the Dan Ryan, there will be additional ramp openings and closings as well as a lane reduction on South Wells Street.

IDOT's "Road Doctors" are announcing the following revised schedule of openings and closures:

-- Today, July 8th, a second local lane has been reopened on the outbound
Dan Ryan from 63rd to 71st Streets. Also, the entrance ramp from
67th Street to the outbound Dan Ryan and the exit ramp from the
outbound Dan Ryan to 71st Street were both reopened to traffic.

-- On July 25th (weather permitting), the exit ramp from the outbound Dan
Ryan to 63rd Street will close for reconstruction of the ramp. This
closure is expected to last until late September.

-- Later this summer, the entrance ramp from 71st Street to the inbound
Dan Ryan and the exit ramp from the inbound Dan Ryan to 67th Street
will reopen to traffic. Also, IDOT expects to reopen the 67th Street
Bridge at this time.

- The opening of the inbound exit ramp at 67th Street is
significant because it will allow inbound Dan Ryan traffic to
access the eastbound Chicago Skyway via State Street to
66th Street.

-- Work crews may be near the traffic lanes for the remainder of the
project. Drivers are urged to be extra cautious in the work zone where
the speed limit is 45 m.p.h. Furthermore, drivers should expect ongoing
shifts in traffic and should be prepared to stop.

This work is part of the $600 million Dan Ryan Expressway reconstruction project. IDOT is in the midst of a four-year reconstruction project on the Dan Ryan from 31st Street to 95th Street. The improved Dan Ryan will include an additional lane in each direction, a reconfigured Skyway interchange and upgrades to the local access roads that run parallel to the expressway. The project goals include improving safety for motorists, reducing commuting time on the city's busiest expressway and creating jobs.

For the most updated information, call 1-877-411-IDOT or visit http://www.danryanexpressway.com/ .



Related Articles

Dan Ryan 55th Street Ramps Open Friday

The Illinois Department of Transportation (IDOT) announced today that the 55th Street (Garfield Boulevard) entrance and exit ramps on the southbound Dan Ryan Expressway (I-90/94) are scheduled to open this Friday. After the 55th Street ramps open, most nearby ramps on the so ...


IDOT Traffic Advisory: Lanes Opening, Labor Day Break on Kingery Expressway

The Illinois Department of Transportation (IDOT) is announcing an updated schedule of Kingery Expressway (I-80/94) openings and construction as the Labor Day holiday approaches. As work progresses throughout the Kingery corridor, IDOT's Road Doctors have planned the followin ...


Overnight Ramp Closures and Lane Reductions Along Southland Corridor in July

The Illinois Department of Transportation (IDOT) is reissuing a warning to "Avoid the Kingery" this summer as lanes will be reduced, and on certain dates, the south suburban expressway will be completely closed for up to eight hours. These traffic slowdowns and stops are nec ...


IDOT Traffic Advisory: Illinois Route 394 Ramp to Kingery Closing for 2 Months

The Illinois Department of Transportation (IDOT) is announcing that the exit ramp from northbound Illinois Route 394 to the eastbound Kingery Expressway (I-80/94) will close for reconstruction on September 6th for approximately two months (weather permitting). The posted ...


I-80/94 Reconstruction Begins March 5th

Chicago Regional Media Advisory for Feb. 22, 2005 TO: Print, broadcast and online media in the Chicago metro area and Northwest Indiana. WHAT: Press conference highlighting roadway reconstruction along I- ...


A Week in Ireland From $499 Including Air

(MARKET WIRE) -- 05/10/2005 -- Brian Moore International Tours once again leads the way with an Amazing Ireland Special from $499 including air. The details of the package include roundtrip air to Shannon or Dublin, 6 nights Bed & Breakfast accommodations with private bat ...


The Ritz-Carlton, Grand Cayman On Track for Late Fall Opening

lton, Grand Cayman is nearing completion and remains on track for a late fall opening, according to developer Michael "Mike" Ryan. Meanwhile, sales remain strong for the multi-million dollar private residences located on property which are anticipated to be the ultimate in l ...